okay.. so i have some pix on here of what the plan is... But many of you may know better of what to do, or may have better ideas...
I would like to take the wall inbetween the two open doors completely out.. Install a header for support and place the tank evenly with the removed wall.... That way it is visible on both sides... I would like to put everything as far as plumbing in the basement (fuge and everything else)
some questions
1. What is everythiing I need, lol, i know its a lot
im thinking, tank, lighting(i want t'5 or maybe a combo) skimmer, fuge, heater, sand, rocks,pumps?
2... I want to redo my floors which are wood... Do i do it before or can it be done after? I everntually will being doing large tiles and i would like to tile around it, i guess?
3. I guess i will need supports in the basement as well?
this is the start, and i know i can find some good info here, thanx guys
(for some reason my pic keeps failing to open) i will try again later)
I would like to take the wall inbetween the two open doors completely out.. Install a header for support and place the tank evenly with the removed wall.... That way it is visible on both sides... I would like to put everything as far as plumbing in the basement (fuge and everything else)
some questions
1. What is everythiing I need, lol, i know its a lot
im thinking, tank, lighting(i want t'5 or maybe a combo) skimmer, fuge, heater, sand, rocks,pumps?
2... I want to redo my floors which are wood... Do i do it before or can it be done after? I everntually will being doing large tiles and i would like to tile around it, i guess?
3. I guess i will need supports in the basement as well?
this is the start, and i know i can find some good info here, thanx guys
(for some reason my pic keeps failing to open) i will try again later)