I just bought a 75gal AGA with a built in overflow. I want to have it drilled for a future closed looped system. I plan on using a mag 9.5 or 1200 when I do install it. I need suggestions on where to drill the wholes and what size bulkheads to use for the drain and return(s).
Thanks,
David
Thanks,
David