Hi all!
I did the plumbing on my new tank yesterday.... here's a quick summary:
75 gal tank
~20 gal sump
mak 4 pump (~1200 gph)
plumbing through holes in water line....
water from pump through a 3/4" bulkhead.
water from tank through 1" bulkhead.
My problem is my pump rate into the tank is WAY exceeding my rate out of the tank to the sump. So obviously i need to fix that.
I figure i could increate the size of the single bulkhead, or add a 2nd bulk head, or both.
Anyone have a feel for what size plumbing should be sufficient?
Thanks!
Ken
I did the plumbing on my new tank yesterday.... here's a quick summary:
75 gal tank
~20 gal sump
mak 4 pump (~1200 gph)
plumbing through holes in water line....
water from pump through a 3/4" bulkhead.
water from tank through 1" bulkhead.
My problem is my pump rate into the tank is WAY exceeding my rate out of the tank to the sump. So obviously i need to fix that.
I figure i could increate the size of the single bulkhead, or add a 2nd bulk head, or both.
Anyone have a feel for what size plumbing should be sufficient?
Thanks!
Ken