Well finally finished the sump routed the edges and chamfered them - stopped raining for a couple of hours
added a heater rack in the return area, finished up 2 media reactors (almost) hooked up the drain and added elbows
the heaters go where that pvc pipe is sitting, that one of the elbows to the drain