I just got my dual reactor in the mail the other day and i'm wondering how to plumb it into my system.
Would it be possible to tee off one of my return lines using ball valves and plumb it directly into the return?
FYI: I'm setting up a 125 gallon with corner overflows.
Thanks!
Would it be possible to tee off one of my return lines using ball valves and plumb it directly into the return?
FYI: I'm setting up a 125 gallon with corner overflows.
Thanks!