Plumbing is Done!!!
Russ and Jim stopped by to do my Plumbing this weekend. Over all, GREAT JOB!!!! I'm very happy and would recomend them!!!!
I'll have Jim or Russ tell you guys what a pain in the butt it was to get this done. The space they had to work with was a 28"cube. On top of that they have to plumb 6 holes for the closed loop plus the sump drain/returns. On top of that... they had to leave me enough space for my dart pump and OM 4way/Calc reactor/2 phosband reactors/ATI BM 160/Co2 tank/Dual PFO 400w ballast and a 20g sump.
I don't know how they did it... but they did!
soooo, here are some Pix... I'll post more tonight with a quick vid of the OM working.
box O Crap... LOL Jim, what do you guys call this thing again?
What a mess.... thank god the wife left early!!!!
Bulk heads in:
manifold for my return pump. this will feed my Calc reactor/2 phosband reactors and has a spot for a chiller if I choose.
Jim putting my fat butt to work:
and It's in:
The rest of the Pix did not load to Photobucket this morning. I'll get some more pix to you tonight and a quick vid of the OM tossing water around.